The shock wave in action. This machine helps break down the layering in our soil and promotes water infiltration as well as oxygenating the soil.
It takes us about two weeks to complete the fairways but the benefits are worth it.
If necessary we roll the fairway afterwards.
All summer annuals have been removed and tulips have been planted throughout the course. This November Julio and Armando planted over twelve thousand!
Removing the old turf around ten approach. The prep work is the hard part and when done properly the sod flourishes.
The rough around ten approach just about finished.
Preparing for sod around the fairway bunker on the 12th hole.
These red flags represent annual bluegrass plants to be removed on the practice green. This is an ongoing process to keep this green as pure bent.
We have put out alternate rakes by the practice bunkers and the 18th green to try. These seem to do a better job than our current ones. The only difference is the width of the rake head. The wider rake is shown below on the left and our current rake is on the right. Quite a difference!
No comments:
Post a Comment